banner banner

Railway Projects Completed in Pakistan

Sr. No. Railway Track Projects

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Construction of 35 KM Railway Siding at Taftan (M/s. Saindak Matel Ltd.)
Construction of 3 KM Siding at Alluwali near Kundian (PAEC)
Construction of Railway Siding at Farooqabad (6.17 km) (M/s. Saba Power)
Track Circuiting at 94 Main Line Stations (Karachi-Peshawar Section)
Replacement of 40 Km of Track on Lahore-Rawalpindi Section
Construction of Double Track at Shershah, Multan
Rehabilitation & Restoration of Rohri-Sibbi Section affected by Flood
Filling up Breach near Dil Murad Railway Station
Track Renewal (Deep Screening) on Pakistan Railways
Level Crossings (147B & 17), (22, 29 & 30), (152 & 20)
Painting of Jhelum Bridge No.220 (Rawalpindi Division)
Special Repair Work requirement of short embankment at different KMs on ROH-KPR Section

Sr. No. Supply of Ballast Projects

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.

Operation of Mechanized Quarries at Shaheenabad
Supply of Ballast on MPS Conversion project
Supply of Ballast from D.G. Khan Quarry
Ballast Project Shaheenabad-II
Ballast Supply at Bandhi
Ballast Supply at Peerak
Ballast supply from Jangshahi Quarry No. I
Ballast supply from Jangshahi Quarry No. II
Ballast Supply at Peerak
Ballast Supply at Kashmore
Ballast Project Shaheenabad
Ballast Project Shershah for Track Renewal Project
Supply, Stacking & loading into Railway Wagons 2" 50mm mechanically crushed stone ballast 5 lacks cft ar Dour
Supply, Stacking & loading into Railway Wagons 2" 50mm mechanically crushed stone ballast 8 lacks cft at Padidan
Supply, Stacking & loading into Railway Wagons 2" 50mm mechanically crushed stone ballast 8 lacks cft at Walhar
Supply, Stacking & loading into Railway Wagons 2" 50mm mechanically crushed stone ballast 8 lacks cft at Dharki
Supply of mechanically crushed 2" (50MM) nominal size stone ballast 8 lacs cft at Liaqatpur-I Railway Station.
Supply, stacking & loading of 2" size mechanically crushed stone from Shaheenabad Quarry (2nd term)
Ballast Supply Line No.2-C at Marshaling Yard Pipri (0.5 million cft)
Ballast Supply Line No.121 at Marshaling Yard Pipri (0.5 million cft)
Ballast Supply for dualization of Bin Qasim-Port Qasim Line at Marshaling Yard Pipri (10 lacks cft)
Supply, stacking and loading into Railway Wagons 2" (50mm) mechnaical crushed stone ballast 5 lac cft at Dour
Supply of Ballast at Walhar-II Station (Mirpur Mathelo) (5 lacks cft)
Supply of Ballast at Sadiqabad (5 lacks cft)
Supply of Ballast at Khanpur (5 lacks cft)
Supply of Ballast at Peerak-II (5 lacks cft)
Supply, stacking and loading Stone Ballast 5 lac cft at Khairpur
Supply, stacking and loading Stone Ballast 513,000 cft at Walhar-II (Mirpur Mathelo)
Supply of 8 lacks cft mechanically crushed Stone Ballast at Liaqatpur-II Railway Station

Home | Sitemap | Feedback | Downloads | Jobs

© Copyright 2014-2018 RAILCOP - All Rights Reserved